Pond Building Project
- 6-acre pond – Before
- 6-acre pond – After
- 6-acre pond – After
- 6-acre pond – After
- 6-acre pond – After
- Area for pond before project.
- Clearing the site.
- Burning the brush.
- Digging the pond & building the dam.
- Digging the pond & building the dam.
- Installing the overflow system.
- Pond done, now filling.
- Seeded and strawed, pond is now full.
Storage Center
- 4-acre mini-storage
- 4-acre mini-storage
- 4-acre mini-storage
Retaining Wall Demolition, Re-Grading Slope and Installing Matting
- Area before project.
- Area before the project.
- Retaining wall removed.
- Grading the bank.
- Topsoil, seeding and matting.
- Finished project.
- Finished project.
Erosion Control
- Eroded Spillway Repair: Before, Floodwater washed away the rip rap
- Eroded Spillway Repair: After, Rock placed back
- Eroded Creek Bank Repair: Before
- Eroded Creek Bank Repair: After, Rip rap installed to prevent further erosion..
- Drain Pipe Repair: Before, Silted in and eroded drain pipe
- Drain Pipe Repair: After, New pipes and rip rap installed
Driveways and Rock Walls
- Rock Retaining Walls: Before
- Rock Retaining Walls: After
- Rock Retaining Walls: Before
- Rock Retaining Walls: After
Horse Arenas
- Building a 14,000 SQ FT Riding arena for a homeowner in Moncure, NC: Before, Area was Cleared and Graded to the correct elevations
- Graded and base Fabic Installed
- Base material graded and border installed
- Done: sand hauled in and graded level
- Finished project
- 14,000 Sq. Ft. riding arena built in Raleigh NC. Graded, base leveled and compacted. Surrounded in timbers and top dressed with a sand and shreaded rubber mixture.
- Indoor riding arena graded and rolled for compaction (Before)
- After
- Smaller riding arena graded and rolled.
- 38,000 SQ FT arena graded in Rolesville, NC.
Overflow Systems and Drains
- 6″ flash board riser and pipe.
- 12″ flash board riser installing in a pond dam in Chapel Hill, NC.
- 18″ flash board riser properly working.
- 24″ Flash board riser installed in a gold course pond.
- Backfilled and graded.
- Standard 18″ overflow system in a pond dam.
- Standard 18″ overflow system in a pond dam.
- French drains and Grading a drain swale. (Before)
- French drains and Grading a drain swale. (After)
- 12″ drain box and 6″ drain line. (Before)
- 12″ drain box and 6″ drain line. (After)
- 12″ drain box and 6″ drain line. Before
- 12″ drain box and 6″ drain line. After
- Installing 24″ concrete drain basins in a Parking lot (Before)
- Installing 24″ concrete drain basins in a Parking lot (After)
Grading
Brush Cutting
- Before
- After
- Before
- After
- Before
- After